Client: SOCAR’s Azneft Production Union
Contractor: SOCAR AQS
Location: The northern part of the Baku archipelago
Scope of work: During 2016-2021 drilling of wells No. 78 (horizon VIII) with an actual depth of 5,910 m and No. 113 (horizon VIII) with an actual depth of 6,200 m from the platform was completed; well No. 117 from the Bulla field (horizon VIII) with a design depth of 5,950 m is currently underway.
7 Albert Buildings
49 Queen Victoria Street
London, EC4N 4SA
United Kingdom
-------------------------------
Baku Bay Tower
8 Noyabr avenue 113
Baku, Azerbaijan AZ1025
Nobel Energy © All rights reserved 2024